Search Results

2474 Results Found

The City of Montclair, the City of Ontario, and the City of Upland are partnering for the resurfacing of Benson Avenue.  The improvements include adding bike lanes, ADA compliant curb ramps, signing and striping. Project Manager: R. Hoerning Approximate Cost: $3,156,900 Funding Source: 2021 Lease Revenue Bonds Local Highway Safey Program [seeking funding] Completion Year:...

A six-foot Class II bike lane will connect the proposed Class IV bike lane on Moreno Street and the Pacific Electric Trail at the northern edge of Montclair. South of Moreno Street, Central Avenue experiences high volumes of traffic; however, north of Moreno Street, Central Avenue is less heavily trafficked and can accommodate bicyclists. The first...

This project intends to repave and landscape approximately 1-1/4 mile stretch of  road. The widening will include traffic signal improvements to make the flow off passing vehicles smoother and safer for pedestrians. The project also included a sewer main capacity replacement main and traffic signal interconnect facilities. Project Manager: R. Hoerning Approximate Cost: $5,617,578 Funding...

Arrow Highway is part of the North Montclair revitalization effort, which includes incorporating complete streets concepts and street beautification elements.  In advance of the planned Arrow Highway Street improvements, a number of underground utilities need to be constructed such as a new Edison circuit system, sewer main line capacity upgrades, traffic signal upgrades and storm...

The existing generator at City Hall does not provide backup energy to other buildings in the Civic Center. The backup generator would allow City Hall and the recreation building located at the Civic Center to continue operating during a Public Safety Power Shutdown (PSPS). Additionally, the American Red Cross uses the recreation building as an...

This page is under construction. Project Manager: M. Heredia Approximate Cost: $139,000 Funding Source: Sewer Operating Fund Completion Year: 2024

The existing bridge, constructed in 1967, is approaching the end of its service life and requires additional capacity. The project entails widening the bridge to add one additional lane in each direction, sidewalks and bike lanes. The proposed Central Avenue replacement bridge over UPRR/Amtrak/Metrolink will include a two-span bridge structure to carry vehicular and pedestrian...

This page is under construction. Project Manager: M. Heredia Approximate Cost: $50,296 Funding Source: 2021 Lease Revenue Bonds Category: Streets Completion Year: 2024

The City was awarded $771,000 for the Ramona Avenue and Howard Street Roundabout Project through the Highway Safety Improvement Program (HSIP). This project will calm traffic, lower speeds, and reduce the chance of a fatal crash occurring in this area. The design will not only make the neighborhood safer with increased visibility and smoother traffic,...

This project will provide ADA access throughout the site via walkways and connect to the new Reeder Ranch Park. The existing barn structure will be demolished and new landscaping will be installed around the Reeder Ranch House. Safety and security measures will include pathway lighting, new fencing, and security cameras. This project will require removal...

Date and time: 2024-05-20 06:00 pmLocation: CANCELLED – Code Enforcement/Public Safety Committee – May 20, 2024Department: Code Enforcement/Public Safety Committee

Date and time: 2024-05-20 05:30 pmLocation: CANCELLED – Real Estate Committee – May 20, 2024Department: Real Estate CommitteeDate and time: 2024-05-20 05:30 pmLocation: CANCELLED – Real Estate Committee – May 20, 2024Department: Real Estate Committee

Date and time: 2024-05-09 10:00 amLocation: CANCELLED - Reeder Heritage Foundation Meeting - May 9, 2024Department: Reeder Heritage FoundationDate and time: 2024-05-09 10:00 amLocation: CANCELLED - Reeder Heritage Foundation - May 9, 2024Department: Reeder Heritage Foundation

This is the project page sharing information about the City of Montclair, CA's alleyway improvement project to start in the late summer/early fall of 2024.

Date and time: 2024-05-06 08:00 pmLocation: City Administrative OfficesDepartment: Personnel CommitteeDate and time: 2024-05-06 08:00 pmLocation: City Administrative OfficesDepartment: Personnel Committee

Close window