Montclair Place District Specific Plan

MPDSP Click Here

Final Environmental Impact Report (SCH 2019050011)

The Final Environmental Impact Report (FEIR) for the proposed Montclair Place District Specific Plan (MPDSP) is complete and available for review below.

The FEIR presents comments on the Draft EIR (DEIR) prepared for the MPDSP, responds in writing to comments on environmental issues, and revises the DEIR as necessary to provide additional clarity.

During the 45-day public review period for the DEIR, July 10, 2020 to August 25, 2020, the City received five comment letters.  The Planning Commission reviewed the project on August 10, 2020, and provided another opportunity to gather public comment on the DEIR.  A list of the comments received, a transcript of the Planning Commission Meeting, copies of the comment letters received, and responses to comments are included in Chapter 2, Responses to Comments, of this FEIR.

Title Page Table of Contents
Introduction Responses to Comments
Changes to the Draft EIR Montclair Place SP MMRP
MPDSP Final EIR

Draft Environmental Impact Report (SCH 2019050011)

 The proposed Montclair Place District Specific Plan (MPDSP) represents the vision for approximately 104 acres of land that includes the existing Montclair Place Mall and surrounding commercial properties as defined by maps within the EIR document.   The MPDSP would assign and create new land use zones for parcels within the Plan Area and provide development standards and architectural guidelines to guide development in the Plan Area through 2040.  A key feature of the MPDSP would provide for the demolition of all or a portion of the existing Mall, some or all appurtenant free-standing outbuildings, and portions of the existing surface parking lots and parking structure to construct a pedestrian-oriented, mixed-use downtown district, with structured parking facilities through a series of planned phases.

The Draft Environmental Impact Report (EIR) prepared for the project evaluates potential environmental effects associated with the proposed MPDSP.  The EIR was available for a 45-day public comment period that commenced on July 10, 2020 and concluded on August 24, 2020.

Public Notice of
Montclair Place District Specific Plan Project
Draft Environmental Impact Report
Montclair Place District Specific Plan
Public Review Draft
Montclair Place District Specific Plan
Draft EIR
Appendix A
Initial Study and Notice of Preparation and Comment Letters
Appendix B-1
Air Quality, Greenhouse Gas, and Energy Modeling Data
Appendix B-2
Health Effects from Criteria Air Pollutant Memo
Appendix C
Soil and Geology Assessment
Appendix D
Phase I Environmental Site Assessment
Appendix E
Noise Modeling Data
Appendix F
Traffic Impact Analysis
Appendix G
Tribal Cultural Consultation
Appendix H-2
Utility Capacity Study
Appendix H-3
Water Capacity Study Exhibits
Appendix H-4 Sewer Capacity Study Exhibits
Appendix H-5
Storm Drain Capacity Study Exhibits
Appendix H-6
Electrical Capacity Study Exhibits

Close window