Recently Completed Projects

Print
Press Enter to show all options, press Tab go to next option

Western and Central Zone 3 Montclair Street Rehabilitation Project

The Western and Central Zone 3 Street resurfacing project, completed June 2016, provided pavement resurfacing throughout a portion of the City where Monte Vista Water District recently constructed water mainline and pavement was deteriorated.  Improvements include removal and replacement of damaged curb, gutter, and sidewalk; replacement of non-compliant Americans with Disabilities Act (ADA) pedestrian ramps; grinding of existing asphalt concrete pavement; and new asphalt concrete pavement.  The project limits are San Bernardino Street on the north, Central Avenue on the west, Orchard Street on the south, and Mills Avenue on the east.

 Rehabilitation Project  W_CZ3 After17a
 W_CZ3 17 Sidewalk Before  W_CZ3 17 Sidewalk After Rehabilitation Project

Demolition of Montclair Residential Properties Project

The City of Montclair demolished two City-owned residential properties located at 4304 and 4324 Kingsley Street in January 2017.  The demolition of these properties will give Sunset Park more recreation space. 

 IMG957557  IMG957599
 Demo Project Before 16a  Demo Project Before 16

 Demo Project After 17

San Bernardino Street Alley Rehabilitation Project

SB Alley After 17The San Bernardino Street Alley Rehabilitation Project, completed December 2016, improved driving conditions in the alleyway located north of the 4700-4800 block of San Bernardino Street.  Improvements included full removal and replacement of asphalt concrete, construction of a new longitudinal concrete gutter, replacement of noncompliant Americans with Disabilities Act (ADA) pedestrian ramps, and new traffic legends.

 

 

 

 

 

Mills Avenue Alley Rehabilitation Project

Mills Alley After 16The Mills Avenue Alley Rehabilitation Project, completed December 2016, improved driving conditions in the alleyway located east of the 9100-9200 block of Mills Avenue. Improvements include full removal and replacement of asphalt concrete, construction of a new longitudinal concrete gutter, replacement of noncompliant Americans with Disabilities Act (ADA) pedestrian ramps, and new traffic legends.

 

Eastern Zone 3 Montclair Street Rehabilitation Project

The Zone 3 Eastern Montclair Street Rehabilitation Project, completed July 2016, consisted of removal and replacement of damaged curb, gutter, and sidewalk; replacement of non-compliant Americans with Disabilities Act (ADA) pedestrian ramps; grinding of existing asphalt concrete pavement; and new asphalt concrete pavement overlays.  The residential street limits of this project are San Bernardino Street on the north, Benson Avenue on the east, Orchard Street on the south, and Central Avenue on the west.

 EZ3 Street Rehab El Morado Before EZ3 Street Rehab El Morado After 
 EZ3 Paving Operations 1  EZ3 Paving Operations

 

Traffic Signal Improvement Project- Central Avenue and San Bernardino Street

Intersection improvements, including new traffic signal equipment that allows for protected left turn phasing in all four directions, replacement of non-compliant Americans with Disabilities Act (ADA) pedestrian ramps, removal of existing asphalt concrete pavement markings, and the addition of new striping and notification signs at the intersection of Central Avenue and San Bernardino Street was completed in May 2016.

 20160316_150138  20160322_131215

 

 

Reeder Citrus Ranch Structural Stability Project

The Reeder Citrus Ranch Structural Stability Project was completed in November 2015.  The project stabilized a historic wooden, two-story structure. Work included leveling the existing bottom floor, construction of new foundations and footings, and the removal on an existing chimney.

 Reeder_Foundation_08  Reeder Struct Before 15
 Reeder Struct After 15  Reeder Struct After 15a
 Reeder Citrus Ranch Const 15  Reeder Citrus Ranch 2015